Solar PV
3rd July 2019 – 17th July 2019
A factory near Bridport requires a 300-kW solar PV array.
Project
Bridmet Ltd, as a high electrical consumer, would like to invite tenders to deliver a solar PV system to take advantage of their large roof area. Systems of around 300 kWp will be considered.
Tender Timelines
The tender timelines are set to ensure Bridmet can submit a grant application at the start of August:
3rd July 2019 Tender out
17th July 2019 Tenders back
Installation Timeline
Main Contractor decision/ Funding: August 2019
Installation: September 2019
Selection
The selection of the successful contractor will be based on an objective assessment of the received quotes with a 50% weight given to cost, 20% to quality and 30% to confidence.
Application
If you would like to tender for the installation, then please contact Edward Hoyland by email at Edward.hoyland@bridmet.co.uk. Further details will be provided on request.
If you are having any difficulty accessing these documents, please contact Derek Moss on 07990 442730 or derek.moss@dorsetcc.gov.uk.
Full guidance on the Low Carbon Dorset procurement process can be found in our online Procurement Guide.